MARC ayrıntıları
| 000 -LEADER |
| fixed length control field |
03554nam a2200337 i 4500 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
101210s2011 njua b 001 0 eng |
| 010 ## - LIBRARY OF CONGRESS CONTROL NUMBER |
| LC control number |
2010047228 |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
9780470935736 |
| Qualifying information |
cloth |
|
| International Standard Book Number |
0470935731 |
| Qualifying information |
cloth |
| 035 ## - SYSTEM CONTROL NUMBER |
| System control number |
(OCoLC)ocn693553935 |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
DLC |
| Language of cataloging |
eng |
| Transcribing agency |
DLC |
| Modifying agency |
YDX |
| -- |
YDXCP |
| -- |
CDX |
| -- |
DLC |
| -- |
BAUN |
| Description conventions |
rda |
| 049 ## - LOCAL HOLDINGS (OCLC) |
| Holding library |
BAUN_MERKEZ |
| 050 04 - LIBRARY OF CONGRESS CALL NUMBER |
| Classification number |
TS178.4 |
| Item number |
.S287 2011 |
| 082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER |
| Edition number |
22 |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Sawik, Tadeusz. |
| 245 10 - TITLE STATEMENT |
| Title |
Scheduling in supply chains using mixed integer programming / |
| Statement of responsibility, etc |
Tadeusz Sawik. |
| 264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE |
| Place of production, publication, distribution, manufacture |
Hoboken, N.J. : |
| Name of producer, publisher, distributor, manufacturer |
Wiley, |
| Date of production, publication, distribution, manufacture, or copyright notice |
[2011] |
|
| Date of production, publication, distribution, manufacture, or copyright notice |
©2011 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xxxv, 455 pages : |
| Other physical details |
illustrations ; |
| Dimensions |
25 cm. |
| 336 ## - CONTENT TYPE |
| Content Type Term |
text |
| Content Type Code |
txt |
| Source |
rdacontent |
| 337 ## - MEDIA TYPE |
| Media Type Term |
unmediated |
| Media Type Code |
unmediated |
| Source |
rdamedia |
| 338 ## - CARRIER TYPE |
| Carrier Type Term |
volume |
| Carrier Type Code |
volume |
| Source |
rdacarrier |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc |
Includes bibliographical references and index. |
| 505 00 - FORMATTED CONTENTS NOTE |
| Title |
List of Figures |
| -- |
List of Tables |
| -- |
Preface |
| -- |
Acknowledgments |
| -- |
Introduction |
| -- |
Outline of the Book |
| -- |
Part One: Short-Term Scheduling in Supply Chains |
| -- |
Chapter 1: Scheduling of Flexible Flow Shops |
| -- |
1.1 Introduction |
| -- |
1.2 Mixed Integer Programs for Scheduling Flow Shops |
| -- |
1.3 Constructive Heuristics for Scheduling Flexible Flow Shops |
| -- |
1.4 Scheduling Flow Shops With Limited Machine Availability |
| -- |
1.5 Computational Examples |
| -- |
1.6 Comments |
| -- |
Exercises |
| -- |
|
| -- |
Chapter 2: Scheduling of Surface Mount Technology Lines |
| -- |
2.1 Introduction |
| -- |
2.2 SMT Line Configurations |
| -- |
2.3 General Scheduling of SMT Lines |
| -- |
2.4 Batch Scheduling of SMT Lines |
| -- |
2.5 An Improvement Heuristic for Scheduling SMT Lines |
| -- |
2.6 Computational Examples |
| -- |
2.7 Comments |
| -- |
Exercises |
| -- |
Chapter 3: Balancing and Scheduling of Flexible Assembly Lines |
| -- |
3.1 Introduction |
| -- |
3.2 Balancing and Scheduling of Flexible Assembly Lines with Infinite In-Process Buffers |
| -- |
3.3 Balancing and Scheduling of SMT Lines |
| -- |
3.4 Comments |
| -- |
Exercises |
| -- |
|
| -- |
Chapter 4: Loading and Scheduling of Flexible Assembly Systems |
| -- |
4.1 Introduction |
| -- |
4.2 Loading and Scheduling of Flexible Assembly Systems with Single Stations and Infinite In-Process Buffers |
| -- |
4.3 Loading and Scheduling of Flexible Assembly Systems with Parallel Stations and Finite In-Process Buffers |
| -- |
4.4 Comments |
| -- |
Exercises |
| -- |
Part Two: Medium-Term Scheduling in Supply Chains |
| -- |
Chapter 5: Customer Order Acceptance and Due Date Setting in Make-to-Order Manufacturing |
| -- |
5.1 Introduction |
| -- |
5.2 Problem Description |
| -- |
|
| -- |
5.3 Bi-Objective Order Acceptance and Due Date Setting |
| -- |
5.4 Lexicographic Approach |
| -- |
5.5 Scheduling of Customer Orders |
| -- |
5.6 Computational Examples |
| -- |
5.7 Comments |
| -- |
Exercises |
| -- |
Chapter 6: Aggregate Production Scheduling in Make-to-Order Manufacturing |
| -- |
6.1 Introduction |
| -- |
6.2 Problem Description |
| -- |
6.3 Bi-Objective Scheduling of Customer Orders |
| -- |
6.4 Multi-Objective Scheduling of Customer Orders |
| -- |
6.5 Scheduling of Single-Period Customer Orders |
| -- |
6.6 Comments |
| -- |
Exercises |
| -- |
|
| -- |
Chapter 7: Reactive Aggregate Production Scheduling in Make-to-Order Manufacturing |
| -- |
7.1 Introduction |
| -- |
7.2 Problem Description |
| -- |
7.3 Mixed Integer Programs for Reactive Scheduling |
| -- |
7.4 Rescheduling Algorithms |
| -- |
7.5 Input and Output Inventory |
| -- |
7.6 Computational Examples |
| -- |
7.7 Comments |
| -- |
Exercises |
| -- |
Chapter 8: Scheduling of Material Supplies in Make-to-Order Manufacturing |
| -- |
8.1 Introduction |
| -- |
8.2 Flexible vs. Cyclic Material Supplies |
| -- |
8.3 Model Enhancements |
| -- |
8.4 Computational Examples |
| -- |
8.5 Comments |
| -- |
Exercises |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name as entry element |
Assembly-line methods |
| General subdivision |
Data processing. |
|
| Topical term or geographic name as entry element |
Business logistics |
| General subdivision |
Data processing. |
|
| Topical term or geographic name as entry element |
Production scheduling |
| General subdivision |
Data processing. |
|
| Topical term or geographic name as entry element |
Integer programming. |
| 900 ## - EQUIVALENCE OR CROSS-REFERENCE-PERSONAL NAME [LOCAL, CANADA] |
| Personal Name |
31623 |
| 942 ## - ADDED ENTRY ELEMENTS (KOHA) |
| Source of classification or shelving scheme |
Library of Congress Classification |
| Koha item type |
Kitap |