Balıkesir Üniversitesi
Kütüphane ve Dokümantasyon Daire Başkanlığı

Scheduling in supply chains using mixed integer programming / (Kayıt no. 28530)

MARC ayrıntıları
000 -LEADER
fixed length control field 03554nam a2200337 i 4500
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 101210s2011 njua b 001 0 eng
010 ## - LIBRARY OF CONGRESS CONTROL NUMBER
LC control number 2010047228
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9780470935736
Qualifying information cloth
International Standard Book Number 0470935731
Qualifying information cloth
035 ## - SYSTEM CONTROL NUMBER
System control number (OCoLC)ocn693553935
040 ## - CATALOGING SOURCE
Original cataloging agency DLC
Language of cataloging eng
Transcribing agency DLC
Modifying agency YDX
-- YDXCP
-- CDX
-- DLC
-- BAUN
Description conventions rda
049 ## - LOCAL HOLDINGS (OCLC)
Holding library BAUN_MERKEZ
050 04 - LIBRARY OF CONGRESS CALL NUMBER
Classification number TS178.4
Item number .S287 2011
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER
Edition number 22
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Sawik, Tadeusz.
245 10 - TITLE STATEMENT
Title Scheduling in supply chains using mixed integer programming /
Statement of responsibility, etc Tadeusz Sawik.
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Hoboken, N.J. :
Name of producer, publisher, distributor, manufacturer Wiley,
Date of production, publication, distribution, manufacture, or copyright notice [2011]
Date of production, publication, distribution, manufacture, or copyright notice ©2011
300 ## - PHYSICAL DESCRIPTION
Extent xxxv, 455 pages :
Other physical details illustrations ;
Dimensions 25 cm.
336 ## - CONTENT TYPE
Content Type Term text
Content Type Code txt
Source rdacontent
337 ## - MEDIA TYPE
Media Type Term unmediated
Media Type Code unmediated
Source rdamedia
338 ## - CARRIER TYPE
Carrier Type Term volume
Carrier Type Code volume
Source rdacarrier
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc Includes bibliographical references and index.
505 00 - FORMATTED CONTENTS NOTE
Title List of Figures
-- List of Tables
-- Preface
-- Acknowledgments
-- Introduction
-- Outline of the Book
-- Part One: Short-Term Scheduling in Supply Chains
-- Chapter 1: Scheduling of Flexible Flow Shops
-- 1.1 Introduction
-- 1.2 Mixed Integer Programs for Scheduling Flow Shops
-- 1.3 Constructive Heuristics for Scheduling Flexible Flow Shops
-- 1.4 Scheduling Flow Shops With Limited Machine Availability
-- 1.5 Computational Examples
-- 1.6 Comments
-- Exercises
--
-- Chapter 2: Scheduling of Surface Mount Technology Lines
-- 2.1 Introduction
-- 2.2 SMT Line Configurations
-- 2.3 General Scheduling of SMT Lines
-- 2.4 Batch Scheduling of SMT Lines
-- 2.5 An Improvement Heuristic for Scheduling SMT Lines
-- 2.6 Computational Examples
-- 2.7 Comments
-- Exercises
-- Chapter 3: Balancing and Scheduling of Flexible Assembly Lines
-- 3.1 Introduction
-- 3.2 Balancing and Scheduling of Flexible Assembly Lines with Infinite In-Process Buffers
-- 3.3 Balancing and Scheduling of SMT Lines
-- 3.4 Comments
-- Exercises
--
-- Chapter 4: Loading and Scheduling of Flexible Assembly Systems
-- 4.1 Introduction
-- 4.2 Loading and Scheduling of Flexible Assembly Systems with Single Stations and Infinite In-Process Buffers
-- 4.3 Loading and Scheduling of Flexible Assembly Systems with Parallel Stations and Finite In-Process Buffers
-- 4.4 Comments
-- Exercises
-- Part Two: Medium-Term Scheduling in Supply Chains
-- Chapter 5: Customer Order Acceptance and Due Date Setting in Make-to-Order Manufacturing
-- 5.1 Introduction
-- 5.2 Problem Description
--
-- 5.3 Bi-Objective Order Acceptance and Due Date Setting
-- 5.4 Lexicographic Approach
-- 5.5 Scheduling of Customer Orders
-- 5.6 Computational Examples
-- 5.7 Comments
-- Exercises
-- Chapter 6: Aggregate Production Scheduling in Make-to-Order Manufacturing
-- 6.1 Introduction
-- 6.2 Problem Description
-- 6.3 Bi-Objective Scheduling of Customer Orders
-- 6.4 Multi-Objective Scheduling of Customer Orders
-- 6.5 Scheduling of Single-Period Customer Orders
-- 6.6 Comments
-- Exercises
--
-- Chapter 7: Reactive Aggregate Production Scheduling in Make-to-Order Manufacturing
-- 7.1 Introduction
-- 7.2 Problem Description
-- 7.3 Mixed Integer Programs for Reactive Scheduling
-- 7.4 Rescheduling Algorithms
-- 7.5 Input and Output Inventory
-- 7.6 Computational Examples
-- 7.7 Comments
-- Exercises
-- Chapter 8: Scheduling of Material Supplies in Make-to-Order Manufacturing
-- 8.1 Introduction
-- 8.2 Flexible vs. Cyclic Material Supplies
-- 8.3 Model Enhancements
-- 8.4 Computational Examples
-- 8.5 Comments
-- Exercises
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Assembly-line methods
General subdivision Data processing.
Topical term or geographic name as entry element Business logistics
General subdivision Data processing.
Topical term or geographic name as entry element Production scheduling
General subdivision Data processing.
Topical term or geographic name as entry element Integer programming.
900 ## - EQUIVALENCE OR CROSS-REFERENCE-PERSONAL NAME [LOCAL, CANADA]
Personal Name 31623
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Kitap
Mevcut
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection code Home library Current library Shelving location Date acquired Cost, normal purchase price Full call number Barcode Date last seen Price effective from Koha item type
    Library of Congress Classification     Non-fiction Mehmet Akif Ersoy Merkez Kütüphanesi Mehmet Akif Ersoy Merkez Kütüphanesi Genel Koleksiyon 04/11/2011 172.69 TS178.4 .S287 2011 031623 22/12/2015 11/01/2015 Kitap
Bizi Sosyal Medyada Takip Edin