| 000 | 01628 am a2200325 i 4500 | ||
|---|---|---|---|
| 001 | 15062 | ||
| 005 | 20260106102245.0 | ||
| 008 | 031212s2005 ohua 001 0 eng | ||
| 020 | _a0131125354 | ||
| 035 | _a(OCoLC) | ||
| 040 |
_cBAUN _aBAUN _beng _erda |
||
| 041 | 0 | _aeng | |
| 049 | _aBAUN_MERKEZ | ||
| 050 | 0 | 4 |
_aTS184 _b.M49 2005 |
| 100 | 1 |
_aMeyers, Fred E. _991439 _eaut |
|
| 245 | 1 | 0 |
_aManufacturing facilities design and material handling / _cFred E. Meyers, Matthew P. Stephens. |
| 250 | _a3rd editon | ||
| 264 | 1 |
_aNew Jersey: _bPearson Prentice Hall, _c2005. |
|
| 300 |
_axvi, 509 pages : _billustrations ; _c24 cm. |
||
| 336 |
_2rdacontent _atext _btxt |
||
| 337 |
_2rdamedia _aunmediated _bn |
||
| 338 |
_2rdacarrier _avolume _bnc |
||
| 500 | _aIncludes index. | ||
| 505 | 0 | 0 |
_t1. Introduction to Manufacturing Facilities Design and Material Handling. _t2. Sources of Information for Manufacturing Facilities Design. _t3. Time Study. _t4. Process Design. _t5. Flow Analysis Techniques. _t6. Activity Relationship Analysis. _t7. Ergonomics and Workstation Design Space Requirements. _t8. Auxiliary Services Requirement Space. _t9. Employee Services-Space Requirements. _t10. Material Handling. _t11. Material Handling Equipment. _t12. Office Layout Techniques and Space Requirements. _t13. Area Allocation. _t14. Facilities Design-The Layout. _t15. Application of Computer Simulation and Modeling. _t16. Selling the Layout. _tAnswers. _tIndex. |
| 650 | 0 |
_aPlant layout. _949754 |
|
| 650 | 0 | _aMaterials handling. | |
| 650 | 0 |
_aProduction engineering. _935233 |
|
| 700 | 1 |
_aStephens, Matthew P. _996443 _eaut |
|
| 942 |
_2lcc _cKT |
||
| 999 |
_c12855 _d12855 |
||