| 000 | 02622nam a2200385 i 4500 | ||
|---|---|---|---|
| 008 | 071022s2008 enka b 001 0 eng | ||
| 010 | _a2007043950 | ||
| 020 | _a9781848210172 | ||
| 020 | _a1848210175 | ||
| 035 | _a(OCoLC)176861760 | ||
| 040 |
_aDLC _beng _cDLC _dBTCTA _dBAKER _dYDXCP _dC#P _dBWX _dBWK _dCDX _dBAUN _erda |
||
| 041 | 1 |
_aeng _hfre |
|
| 049 | _aBAUN_MERKEZ | ||
| 050 | 0 | 4 |
_aTS157.5 _b.O731 2008 |
| 082 | 0 | 0 | _222 |
| 130 | 0 |
_aOrdonnancement de la production. _lEnglish |
|
| 245 | 1 | 0 |
_aProduction scheduling / _cedited by Pierre Lopez, François Roubellat |
| 264 | 1 |
_aLondon : _bISTE ; _c2008. |
|
| 264 | 1 |
_aHoboken, NJ : _bJohn Wiley and Sons, _c2008. |
|
| 300 |
_axii, 375 pages : _billustrations ; _c25 cm |
||
| 336 |
_atext _btxt _2rdacontent |
||
| 337 |
_aunmediated _bn _2rdamedia |
||
| 338 |
_avolume _bnc _2rdacarrier |
||
| 490 | 1 | _aControl systems, robotics and manufacturing series | |
| 504 | _aIncludes bibliographical references and index | ||
| 500 | _a"First published in France in 2001 by Hermes Science entitled "Ordonnancement de la production""--T.p. verso | ||
| 505 | 0 | 0 |
_tTable Of Contents: _tPreface _tChapter 1. Statement of Production Scheduling _rFrançois ROUBELLAT and Pierre LOPEZ _tChapter 2. Basic Concepts and Methods in Production Scheduling _rPatrick ESQUIROL and Pierre LOPEZ _tChapter 3. Metaheuristics and Scheduling _rMarino WIDMER, Alain HERTZ and Daniel COSTA _tChapter 4. Genetic Algorithms and Scheduling _rMarie-Claude PORTMANN and Antony VIGNIER _tChapter presentation _tChapter 5. Constraint Propagation and Scheduling _rPatrick ESQUIROL, Pierre LOPEZ and Marie-José HUGUET _tChapter organization _tChapter 6. Simulation Approach _rGérard BEL and Jean-Bernard CAVAILLÉ _tChapter 7. Cyclic Production Scheduling _rJean-Claude GENTINA, Ouajdi KORBAA and Hervé CAMUS _tChapter 8. Hoist Scheduling Problem _rChristelle BLOCH, Marie-Ange MANIER, Pierre BAPTISTE. and Christophe VARNIER _tChapter 9. Shop Scheduling with Multiple Resources _rJean-Charles BILLAUT, Jacques CARLIER, Emmanuel NÉRON and Antoine OLIVER _tChapter 10. Open Shop Scheduling _rChristian PRINS _tChapter 11. Scheduling Under Flexible Constraints and Uncertain Data: The Fuzzy Approach _rDidier DUBOIS, Hélène FARGIER and Philippe FORTEMPS _tChapter 12. Real-Time Workshop Scheduling _rChristian ARTIGUES and François ROUBELLAT _tList of Authors _tIndex |
| 650 | 0 | _aProduction scheduling | |
| 650 | 0 | _aInventory control | |
| 700 | 1 | _aLopez, Pierre | |
| 700 | 1 | _aRoubellat, François | |
| 830 | 0 |
_9109399 _aControl systems, robotics and manufacturing series. |
|
| 900 | _a31261 | ||
| 942 |
_2lcc _cKT |
||
| 999 |
_c27701 _d27701 |
||