245 1 0 _aPrinciples of sequencing and scheduling /
_cKenneth R. Baker, Dan Trietsch.
264 1 _aHoboken, N.J. :
_bJohn Wiley,
_c[2009]
264 4 _c©2009
300 _axv, 493 pages :
_billustrations ;
_c25 cm.
336 _atext
_btxt
_2rdacontent
337 _aunmediated
_bn
_2rdamedia
338 _avolume
_bnc
_2rdacarrier
504 _aIncludes bibliographical references and indexes.
505 0 0 _t-- Introduction
_t-- Single-machine sequencing
_t-- Optimization methods for the single-machine problem
_t-- Heuristic methods for the single-machine problem
_t-- Earliness and tardiness costs
_t-- Sequencing for stochastic scheduling
_t-- Safe scheduling
_t-- Extensions of the basic model
_t-- Parallel-machine models
_t-- Flow shop scheduling
_t-- Stochastic flow shop scheduling
_t-- Lot streaming procedures for the flow shop
_t-- Scheduling groups of jobs
_t-- The job shop problem
_t-- Simulation models for the dynamic job shop
_t-- Network methods for project scheduling
_t-- Resource-constrained project scheduling
_t-- Safe scheduling for projects
_t-- Appendix A: Practical processing time distributions
_t-- Appendix B: The critical ratio rule