| 000 | 01805cam a22003137i 4500 | ||
|---|---|---|---|
| 001 | 44226 | ||
| 008 | 080922s2009 njua b 001 0 eng | ||
| 010 | _a 2008041829 | ||
| 020 |
_a9780470391655 _q(cloth) |
||
| 020 |
_a0470391650 _q(cloth) |
||
| 035 | _a(OCoLC)ocn256535210 | ||
| 040 |
_aDLC _beng _cDLC _dBTCTA _dYDXCP _dYDX _dCDX _dC#P _dBWX _dTTS _dDLC _dBAUN _erda |
||
| 049 | _aBAUN_MERKEZ | ||
| 050 | 0 | 0 |
_aTS157.5 _b.B35 2009 |
| 082 | 0 | 0 | _222 |
| 100 | 1 |
_aBaker, Kenneth R., _d1943- _9106975 |
|
| 245 | 1 | 0 |
_aPrinciples of sequencing and scheduling / _cKenneth R. Baker, Dan Trietsch. |
| 264 | 1 |
_aHoboken, N.J. : _bJohn Wiley, _c[2009] |
|
| 264 | 4 | _c©2009 | |
| 300 |
_axv, 493 pages : _billustrations ; _c25 cm. |
||
| 336 |
_atext _btxt _2rdacontent |
||
| 337 |
_aunmediated _bn _2rdamedia |
||
| 338 |
_avolume _bnc _2rdacarrier |
||
| 504 | _aIncludes bibliographical references and indexes. | ||
| 505 | 0 | 0 |
_t-- Introduction _t-- Single-machine sequencing _t-- Optimization methods for the single-machine problem _t-- Heuristic methods for the single-machine problem _t-- Earliness and tardiness costs _t-- Sequencing for stochastic scheduling _t-- Safe scheduling _t-- Extensions of the basic model _t-- Parallel-machine models _t-- Flow shop scheduling _t-- Stochastic flow shop scheduling _t-- Lot streaming procedures for the flow shop _t-- Scheduling groups of jobs _t-- The job shop problem _t-- Simulation models for the dynamic job shop _t-- Network methods for project scheduling _t-- Resource-constrained project scheduling _t-- Safe scheduling for projects _t-- Appendix A: Practical processing time distributions _t-- Appendix B: The critical ratio rule _t-- Appendix C: Integer programming models for sequencing. |
| 650 | 0 | _aProduction scheduling. | |
| 700 | 1 | _aTrietsch, Dan. | |
| 942 |
_2lcc _cKT |
||
| 999 |
_c43175 _d43175 |
||