| 000 | 01143nam a2200277 i 4500 | ||
|---|---|---|---|
| 008 | 960513s1996 enka b 001 0 eng d | ||
| 010 | _a 96084242 | ||
| 020 | _a0412735407 | ||
| 035 | _a(OCoLC)35798976 | ||
| 040 |
_aUkGUS _cUkGUS _dDLC _dBAUN _erda |
||
| 049 | _aBAUN_MERKEZ | ||
| 050 | 0 | 4 |
_aTS157.4 _b.C44 1996 |
| 082 | 0 | 0 | _221 |
| 100 | 1 |
_aCheng, T. C. E. _q(T. C. Edwin) |
|
| 245 | 1 | 0 |
_aJust-in-time manufacturing : _ban introduction / _cT.C.E. Cheng and S. Podolsky. |
| 250 |
_a2nd ed. / _brevised and updated by P. Jarvis. |
||
| 264 | 1 |
_aLondon ; _aNew York : _bChapman and Hall, _c1996. |
|
| 300 |
_axv, 249 pages : _billustrations ; _c24 cm. |
||
| 504 | _aIncludes bibliographical references (pages 236-243) and index. | ||
| 505 | 0 | 0 |
_tPreface _tPreface to the first edition _t1. Introduction _t2. Just-in-time production _t3. Just-in-time logistics _t4. Total quality management _t5. Total employee involvement _t6. Implementing JIT manufacturing _t7. Industrial case study _t . References |
| 650 | 0 | _aJust-in-time systems. | |
| 700 | 1 |
_aPodolsky, S. _q(Susan) |
|
| 700 | 1 | _aJarvis, P. | |
| 900 | _a1750 | ||
| 942 |
_2lcc _cKT |
||
| 999 |
_c4462 _d4462 |
||